Project Background
An EPC contractor was responsible for a complete overhead transmission line package and needed a reliable supplier for conductor and line materials.
Customer Requirements
The customer required technical support during bidding, fast document preparation, stable product quality, and on-time delivery after contract award.
Product Scope
ACSR Hawk conductor, ACSR Drake conductor, AAAC 240mm² conductor, galvanized steel wire, earth wire, and project-related overhead line materials.
Technical Standards
IEC 61089, ASTM B232, BS EN 50182, and project tender specifications.
Supply Challenge
The EPC contractor needed accurate technical documents, competitive supply planning, and coordinated delivery to match the overall project execution schedule.
Solution
We supported the customer with technical datasheets, compliance documents, packing details, and delivery planning. After order confirmation, production and inspection were managed according to project milestones.
Delivery Result
The materials were delivered as planned and helped the EPC contractor complete the overhead transmission line package with reliable technical and supply support.