Country / Year
Egypt / 2020
Project Background
To support the country’s renewable energy development program, a utility-scale wind farm was constructed in a high-wind coastal region. The project included wind turbine foundations, collector circuits, internal distribution systems, and electrical infrastructure connecting the wind farm to the transmission network.
Customer Requirements
The customer required cable systems capable of operating reliably under harsh environmental conditions, including high temperatures, sand, strong winds, and continuous mechanical stress. Compliance with international standards and long-term operational reliability were essential project requirements.
Product Scope
Medium-voltage power cables, low-voltage power cables, control cables, instrumentation cables, grounding conductors, communication cables, and cable accessories.
Technical Standards
IEC 60502, IEC 60228, IEC 60332, IEC 60754, IEC 61034, IEC standards for renewable energy projects, and project-specific technical requirements.
Supply Challenge
Construction activities were carried out simultaneously across dozens of turbine locations over a large geographic area. Material deliveries required careful scheduling to support foundation construction, turbine installation, cable laying, and commissioning without interrupting overall project progress.
Solution
Close coordination with the EPC contractor allowed production schedules to align with construction milestones. Products were manufactured according to approved technical specifications, fully tested before shipment, and supported by comprehensive documentation to simplify installation and project inspection.
Delivery Result
The cable systems were successfully installed throughout the wind farm, contributing to efficient project commissioning and providing reliable electrical infrastructure for long-term renewable energy generation.